Investment Returns

Provide customers with a complete set of  brass rod production lines,

upgrade production line equipment, and improve production efficiency.

Client Information

Location: PAKISTAN

Customer information: 8th client in PAKISTAN

Cooperation time for this order: August 25, 2021

Shipping time: October 25, 2021

Background

In order to achieve stable basic production,

the customer ordered a new brass rod horizontal continuous casting production line from us,

which directly solves the comprehensive production problem from scrap melting to bar processing.

Requests

Main products: 1.90kw electric furnace + control cabinet
2.GYT75kw smelting furnace
3. Take-up machine (cyan) + take-up stand
4.3 take-up machines  + electrical cabinet + 2 take-up racks
5. Lead casting machine + control cabinet
6. Peeling mold
7. Crystallizer
8. Horizontal wire drawing machine
9.Butt welding machine
10.ZT-350 head tying machine
11. Peeling machine